top of page

PIA - Sub-duct and cable install

S7

£420.00

Total inc. VAT + Registration fee

Duration:

Days: 2

Total:

£350.00

Registration Fee:

£ -

Cost (exc VAT):

£350.00

NRSWA Card:

00

The S7 PIA Sub-Duct and Cable Installation Underground (Underground Install) course equips delegates with the knowledge and skills to safely and successfully deploy cable and sub-duct within the Openreach Underground (UG) infrastructure.

Assessment will be completed in a live or simulated situation utilising the current methodology employed by the Communication Provider (CP) to install their sub-duct and/or cable. This can be mechanised or manual. A CP cable shall be installed in a minimum of 2 duct sections (3 x Joint boxes) containing Openreach network cabling.

Dates:

For upcoming dates please contact training@mia-direct.com before booking.

bottom of page